Budget data |
|
Input for Budget (AFE) cost items per Well Phase (Phase Code). Note that Cost Group, Cost Class, Cost Type and Charge Type only accept values from the drop-down list for each column. Values in the drop-down list are fully customizable as they are populated from lookup tables.
|
|
|
|
Actual vs. Budget |
|
When the Calculate button is pressed, the budget data will be summarized per Cost Item. A Cost Item is taken as a combination of the Cost Group and Cost Class values in the budget data grid. For each Cost Items the total amount will be calculated across all Phase Codes. For each Cost Item a total amount is also calculated from the cost data in the Daily Drilling Reports. The summary data is presented as tabular data in this grid and as a bar chart in the bottom-right pane.
|
|
|
|